Finish Line
- Made more Concept Art (Sniper Superunit, Sniper Tower, Gatling, Crippler) (4.5 Hrs)
- Orthographics (Sniper Superunit) (2.5 Hrs)
- Environment test (1.5 Hrs)
- Zbrush sculpting (1.5 Hrs)
- Kamikaze Weightpainting (1 Hr)
Progress
Sniper Superunit Orthographics:Sniper Superunit CA:
Sniper Tower CA:
Gatling Unit CA:
Crippler Unit CA:
Environmental Concept:
Augher Sculpting:
Weightpainting:
Battle Plan
- Get as much work done as possible before Thanksgiving break
- Catching up on the work I'm behind in
- Even help out with Environmental Design
Damage Control
- I fell behind the quota and need to catch up on whatever work I need to do.
- I will try to get as much concepts out to help out with everything.
- We are still trying to figure out a design for crippler which might push us back a little.



No comments:
Post a Comment