Awesome week! Got some work done before a long weekend in Boston. Break over and now back to work, work, work.

Finish Line

  • Made more Concept Art (Gatling, Sniper Tower) (1.5 Hr)
  • Kamikaze Unit and Superunit Weightpainting (5 Hr)

Progress

Gatling Unit:
Sniper Tower:


Weightpainting:




 

 Battle Plan

  • Getting back on track with work
  • Focus on finalizing designs for units, superunits, and towers

Damage Control

  • This week was shorter because I had something planned for Thanksgiving
  • There are some things to still talk about for Tower design
  • Once we get one design in for towers, it will set the pace for the rest like previous design hurdles such as for the Gygan and unit.

tl;dr

Good Thanksgiving. Time to get back to work.